Cliantech Secures 1.2 GW AI-Driven Solar Module Production Line Order from IB Solar
Cliantech Solutions has received a 1.2 GW order from IB Solar for an AI-driven solar module production line, scheduled for commissioning by May 2026. This order increases Cliantech's total installed capacity to 1.8 GW, following a previous 600 MW capacity. The new production line will manufacture advanced solar modules and utilize automation and inspection systems from global providers, enhancing operational efficiency and product quality.

Cliantech Solutions has secured a 1.2 GW order from IB Solar for an AI-driven solar module production line, set to be commissioned by May 2026. This new order, which builds on a previously commissioned 600 MW capacity, raises Cliantech's total installed capacity to 1.8 GW.
The production line will manufacture advanced M10 TOPCon, M10R, and G12R solar modules, integrating advanced automation and inspection systems from providers like Gaorun, Visual, and Asicpy. IB Solar aims to scale its module manufacturing capacity to 5 GW with this automated line, furthering its backward integration into solar cell manufacturing. Cliantech's focus on automation positions it as a significant player in India's solar manufacturing sector.




Comments