Díaz-Canel Inspects Paso Seco Water Supply and Energy Storage Projects in Havana
President Miguel Díaz-Canel Bermúdez evaluated maintenance efforts at the Paso Seco water supply source critical for Havana, addressing ongoing water shortages amid energy crises. The project, involving multiple national entities, aims to repair infrastructure and enhance backup power systems to ensure consistent water delivery to residents.

The Paso Seco water supply source, essential for water distribution in Havana, is currently undergoing repairs to address infrastructure deterioration and enhance backup power capabilities. In a visit to the site, President Miguel Díaz-Canel highlighted the urgency of resolving water shortages exacerbated by prolonged power outages affecting the city.
The National Electric Union plans to deploy motors within 72 hours to ensure continuous operations during electrical disruptions. Additionally, a Battery Energy Storage System (BESS) project is being constructed to support the National Electrical System with 200 MW capacity, expected to be operational by October 30. This dual initiative is vital for improving water and energy reliability in the Cuban capital as the country faces ongoing challenges from external blockades.




Comments