Indian Army Commences Overhaul of Arjun Tanks After Six-Year Delay
The Indian Army has initiated the long-awaited overhaul of the Arjun tank fleet, starting with two MK-1 tanks. This process, taking place at the Heavy Vehicles Factory in Avadi, includes 26 upgrades and aims to enhance operational readiness amid ongoing logistical challenges.

The Indian Army has commenced the overhaul of its Arjun tank fleet after a six-year delay, beginning with two MK-1 tanks at the Heavy Vehicles Factory in Avadi. The overhaul includes 26 upgrades derived from the MK-1A variant, with repair procedures developed during this project to guide the refurbishment of the remaining 124 tanks.
The initial overhaul was due in 2020 but faced delays due to inadequate spares and the absence of repair facilities. Once dismantled, components will be sent to various specialized facilities for further work.
Despite these improvements, the Arjun's high imported content continues to create availability issues. The overhaul's successful execution is critical for the operational readiness of the armored regiments, particularly in the challenging desert terrain of Rajasthan.




Comments