Theia

Article

PT Pertamina Hulu Rokan Reports 1,274 BOPD from Libo SE #86 Well in Riau

FLOW CONTROL

PT Pertamina Hulu Rokan (PHR) announced that the Libo SE #86 well in Siak, Riau, achieved a production rate of 1,274 barrels of oil per day in early 2026, with a 0% water cut. The well was drilled to a depth of 5,680 feet in the Top Menggala layer, using selective perforation and optimizing Electric Submersible Pump (ESP) technology.

PHR is also drilling the Libo SE #88 well and plans to drill four additional wells through infill drilling to maximize oil potential in the area. The collaboration among various teams was crucial for the success of this project.

PT Pertamina Hulu Rokan Reports 1,274 BOPD from Libo SE #86 Well in Riau
Feb 17, 2026, 2:57 PM

No comments yet. Be the first to share your thoughts!