ADS-TEC Energy Partners with Stadtwerke Mühlacker for 10 MW Battery Storage Project in Germany
ADS-TEC Energy PLC is collaborating with Stadtwerke Mühlacker to install a 10 MW battery storage system with a 20 MWh capacity at a substation in Mühlacker, Germany. This project aims to enhance energy system flexibility as electricity demand rises due to electric mobility and digital infrastructures.
ADS-TEC is responsible for the planning, implementation, and integration of the storage system, which includes four battery storage containers based on the BESS5000 system. The partnership focuses on achieving operational reliability and long-term management with a local partner.
The system is designed to stabilize the grid and create revenue opportunities in the electricity market. All development and integration processes are conducted in Germany to meet high standards for security and availability.
