Belararox Mobilizes Second Drill Rig to Accelerate TMT Project Exploration in Argentina
STRATEGIC MINERALS
Belararox Limited is accelerating its drilling program at the TMT Project in Argentina by mobilizing a second diamond rig. This rig is set to begin operations in early March 2026 and will focus on follow-up drilling at Toro Central, where three drill holes have been completed, with first assay results anticipated soon.
The existing rig is drilling at Toro South, targeting a shallow epithermal system over a larger copper porphyry target. Completed magnetotelluric and induced polarization surveys at Tambo South will inform future drilling strategies. Belararox reported cash reserves of A$7.10 million and zero debt at the end of December 2025.

Feb 16, 2026, 12:22 PM