Grounded Lithium Corp. Updates Operations and KLP Progress
Grounded Lithium Corp. reports May 2026 oil production at 114 bpd, with plans to exceed 150 bpd post-upgrades. The pre-feasibility study for the Kindersley Lithium Project is under review, poised to guide future developments.

Grounded Lithium Corp. (TSXV: GRD, OTC: GRDAF) reported oil production of 114 barrels per day (bpd) for May 2026, consistent with April figures. Plans are in place to enhance production capabilities, potentially exceeding 150 bpd after facility improvements.
Additionally, the company is collaborating with Denison Mines Corp on the Kindersley Lithium Project (KLP), with the pre-feasibility study currently under review. A positive outcome from this study will be critical for advancing the project. The operational updates reflect ongoing efforts to optimize both oil and lithium production, indicating a strategic focus on resource development.




Comments