L'Anse to Conduct Smoke Testing on Sewer System in August 2026
The Village of L'Anse will perform smoke testing on its sanitary sewer system on August 5 and 6, 2026, to identify inflow and infiltration issues. This initiative aims to address system limitations exacerbated by heavy rainfall, which has led to sewer overflows and potential public health risks.

The L'Anse Wastewater Treatment Plant will conduct smoke testing on August 5 and 6, 2026, to identify inflow and infiltration (I&I) within the sewer system. I&I has contributed to three sewer overflow events in the last two years, as the system was not designed to handle stormwater.
Residents are advised to ensure water is present in drain traps to prevent smoke from entering homes. Smoke testing will help locate cracks in pipes and illegal connections. The village aims to secure funding for necessary repairs and address the outdated system, which has reached maximum capacity during frequent heavy rain events. Residents should report any smoke observed in their homes during testing to assist in identifying plumbing issues.




Comments