Theia

Article

Manono Lithium Launches Tender for Phase I Water Well Construction Project in DRC

SOLAR ENERGYSTRATEGIC MINERALS

Manono Lithium SAS has issued a tender for the Phase I construction of water wells in Manono, Democratic Republic of the Congo. The project involves the construction of thirteen mechanical drill water wells, with depths ranging from 120 to 210 meters.

The wells will be equipped with a solar pumping system, which includes solar submersible pumps, photovoltaic panels, MPPT controllers, cables, support structures, distribution boxes, lightning protection devices, and a 5 m³ water storage tank. The system will feature automatic control for pump operation based on water levels, as well as manual operation capabilities. The project site is located in the Manono Lithium mining area in the Tanganyika province.

Manono Lithium Launches Tender for Phase I Water Well Construction Project in DRC
Jan 30, 2026, 6:00 AM

No comments yet. Be the first to share your thoughts!