Marine Warranty Surveyor Appointed for Jeonnam 1 Offshore Wind Project in Korea
Jeonnam 1, a 96-MW offshore wind farm, is set to be operational in 2025 as Korea's first commercial offshore project. ABL is overseeing the transportation and installation processes for critical components, marking significant progress in the project timeline.

The Jeonnam 1 offshore wind farm, located in Shinan County, Korea, will feature ten wind turbine generators and has a scheduled operational date of 2025. ABL has been designated as the marine warranty surveyor for the project's transportation and installation, which includes foundations, export cables, inter array cables, and turbine components.
As of September 30, 2024, the installation of the first wind turbine generator has been completed, with ABL surveyors from Korea and Singapore present for oversight. The site has water depths between 5 and 20 meters, and monopile foundations are being utilized with diameters reaching 8.5 meters. This project is pivotal for Korea's renewable energy landscape, potentially influencing future offshore developments.




Comments