Novra Power to Develop Gas Turbine Fleet for AI Data Centers Using Additive Manufacturing
Novra Power is set to develop a fleet of gas turbine rental assets to alleviate power supply issues for AI data centers, utilizing additive manufacturing to streamline the supply chain. These transportable turbines will provide interim power solutions until grid connections are established, with major components produced via 3D-printing technology for quicker deployment. Founded in 2025, Novra Power aims to partner for a demonstration site by the end of 2026.

Novra Power is addressing power supply bottlenecks for AI data centers by deploying a fleet of fast power gas turbine rental assets. The company has developed intellectual property utilizing additive manufacturing (3D-printing) to create a new supply chain, aimed at reducing the time-to-power problem.
These transportable gas turbines are specifically designed for large-scale AI data centers and will provide bridging power until utility grid connections are established. Major components of the turbines will be produced using additive manufacturing technologies, enabling faster availability of power generation equipment. Novra Power, founded in 2025, seeks partnerships for a demonstration site deployment by the end of 2026.




Comments