Paradise Analyzes Two Sites for Wastewater Treatment Facility in Sewer Project
The Town of Paradise is evaluating two sites for a Wastewater Treatment Facility as part of the Paradise Sewer Project. The sites are along the Skyway corridor, with one near Crossroads and the other near Media Way. The Subsequent Environmental Impact Report (SEIR) is in development and expected to be released in April 2026, assessing environmental impacts and alternatives, including a 'No Project' option. The project aims to improve public health and protect groundwater, with a public review period of 45 days planned once the draft SEIR is available.

The Town of Paradise is assessing two potential sites for a Wastewater Treatment Facility under the Paradise Sewer Project, located along the Skyway corridor near Crossroads and Media Way. The Subsequent Environmental Impact Report (SEIR) is currently being developed and is slated for public release in April 2026, with evaluations of environmental impacts and project alternatives.
This initiative aims to create a centralized wastewater system to enhance public health and groundwater protection. A 45-day public review period will follow the draft SEIR release, primarily impacting downtown Paradise and some residential areas.




Comments