Protests Halt Ken-Betwa Dam Construction in Madhya Pradesh Over Compensation Issues
Protests by residents affected by the Ken-Betwa Link Project in Madhya Pradesh have halted construction due to compensation disputes. The protestors demand fair compensation totaling ₹12.50 lakh, prompting local authorities to impose prohibitory orders.

Construction of the Ken-Betwa dam in Madhya Pradesh is currently halted due to protests from displaced residents, who demand ₹12.50 lakh in compensation. The protests involve villagers from over 40 locations within the dam's submergence zone, including Dhaudan and Palkonha, citing unfair distribution of compensation.
Local authorities have attempted negotiations, but protesters insist on discussions with higher officials. This situation marks the second construction stoppage in two months, with security measures intensified to prevent additional protests. The project, initiated in 2024, aims to channel excess water from the Ken river and has significant implications for regional irrigation and hydropower generation.




Comments