Resolution Minerals Initiates 13,700m Drill Campaign at Horse Heaven Gold Project in Idaho
Resolution Minerals is launching a 13,700-metre, 45-hole diamond drilling program at its Horse Heaven gold project in Idaho. The program aims to define the size and shape of the Golden Gate gold mineralised system and support a maiden JORC-compliant resource estimate targeted for Q1 2027. Drilling is scheduled to commence in early May 2026 and continue through mid-August, utilizing two MP1500 core rigs. The project has identified significant gold and tungsten mineralization, with all previous drill holes intersecting mineralization and remaining open at depth.

Resolution Minerals is starting a 13,700-metre, 45-hole diamond drilling program at its Horse Heaven gold project in Idaho. This initiative aims to define the Golden Gate mineralised system and progress towards a maiden JORC-compliant resource estimate expected in Q1 2027.
Drilling will begin in early May 2026 and will run through mid-August, featuring two MP1500 core rigs. The program focuses on Golden Gate North and South, with 60% of drilling dedicated to South. Historical drilling has shown continuous gold mineralisation, with significant intersections and potential tungsten deposits.


Comments