Construction Progress at Dry Dock 5 for U.S. Navy's Shipyard Infrastructure Optimization Program

As of April 25, 2025, construction is underway at the Dry Dock 5 (DD5) site within the Shipyard Infrastructure Optimization Program (SIOP) at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility. This project is essential for enhancing the U.S. Navy Fleet's readiness and lethality.




Comments