Florina Secures ESFA Funding for Natural Gas Infrastructure and Heating System Upgrades
The ESFA has approved funding for natural gas infrastructure and heating system upgrades in Florina for the period 2021-2027. The second phase includes a new distribution network with 16,251.55 meters of low-pressure pipeline and 2,214.90 meters of medium-pressure pipeline, costing €6,314,990.50. Additionally, €17,033,012.50 is allocated for replacing heating systems with natural gas systems.

The ESFA has approved the second phases of natural gas infrastructure and heating system upgrades in Florina as part of the 2021-2027 programme. This includes the construction of a new natural gas distribution network featuring approximately 16,251.55 meters of low-pressure pipeline and 2,214.90 meters of medium-pressure steel pipeline, at a public expenditure of €6,314,990.50.
Furthermore, funding of €17,033,012.50 has been allocated for replacing heating systems with natural gas systems. This phase involves completing construction and obtaining necessary certifications for consumer connections.




Comments