PT PGN LNG Indonesia Begins 2026 Operations with Ship-to-Ship Transfer at FSRU Lampung
NATURAL GAS
PT PGN LNG Indonesia conducted a Ship-to-Ship Transfer (STS) at FSRU Lampung, marking the start of its LNG operations in 2026. The STS involved a delivery of 140,500 m³ of LNG from Donggi Senoro LNG Terminal, Central Sulawesi.
In 2025, PGN LNG regasified 23 LNG cargos at FSRU Lampung and is set to receive 30 LNG cargos in 2026. FSRU Lampung, managed by PGN LNG, has a storage capacity of 170,000 m³ and a regasification capacity of 240 MMSCFD. PGN LNG aims to ensure reliable gas supplies to the West Java and Sumatra industrial sectors and supports Indonesia's energy transition to net zero emissions by 2060.

Jan 20, 2026, 6:00 AM