Theia

Article

Woodside Energy's Scarborough FPU Arrives at Western Australia Gas Project Site

NATURAL GAS

Woodside Energy Group Ltd announced the arrival of the floating production unit (FPU) for the Scarborough Energy Project at its offshore site in Western Australia. The project includes the Scarborough gas field development and construction of Pluto Train 2, aiming for first LNG cargo in the second half of this year.

As of Q3 2025, the project was 91% complete. The FPU, weighing 70,000 metric tons and built by McDermott International, will process gas and features emissions-reduction systems. The project is expected to contribute over A$55 billion in taxes and supply 225 terajoules of gas daily to the Western Australian market. Woodside operates the project with a 74.9% stake, alongside JERA and LNG Japan.

Woodside Energy's Scarborough FPU Arrives at Western Australia Gas Project Site
Jan 15, 2026, 6:06 AM

No comments yet. Be the first to share your thoughts!