The petition seeks approval for the truing up of the transmission tariff for the 2019-24 tariff period and the determination of the tariff for the 2024-29 period. Key components include the 400 kV Raipur-Rourkela Double Circuit Transmission Line, the extension of Raipur and Rourkela substations, reconductoring of the Jharsuguda/Sundargarh-Rourkela 2×D/C line section, and upgradation of 400 kV bays at the Rourkela Substation.